SECTION 01 | THE PLATFORM
CAMBRIDGEPORT.NET - PAGE 24
SUPPLY SECURED | SCHEDULE PROTECTED
HYPERSCALE PROGRAMS DON’T FAIL ON 
ENGINEERING. THEY FAIL ON LEAD TIME.
Cambridgeport has locked the long-lead components that stall everyone else — so the 10–12 week
commitment survives contact with reality.
8,000 fans/year
Infinitum partnership: 8,000+ Aircore MC fans per year available 
for delivery — 24,000 allocated over 36 months — standardized on 
Aircore MC motors with integral AFE across the entire Guardian line.
CAMBRIDGEPORT
M
A
D
E
 
I
N
 
T
H
E
 
U
S
A
FANS - INFINITUM
8,000 fans/yr staged for critical-
schedule delivery. One standardized
IE5 platform line-wide — no motor
requalification between projects.
CONTROLS - MULTIPLE OEMs
Delta DDC and Siemens PLC OEM
relationships — controllers, HMIs and
valves secured for schedule certainty,
built to the owner's standard.
COILS - MULTIPLE OEMs
Multiple OEM coil partnerships sized
and reserved for mission-critical
builds, with capacity held against
forecast — no single-source 
coil exposure.
Mission-Critical Scheduling Multiple integrated Massachusetts facilities — with automated Prima Power 
fabrication — can be brought online for critical-schedule opportunities, so volume and date commitments hold 
through peak demand.
OUR DATA CENTER PARTNERS
AAF (American Air Filters)
Aerofin
Carel USA
Delta Controls
Dristeem
Direct Coil
Dwyer
EBM Papst Fans
Ebtron
Fresh Air Solutions
Greenheck Dampers
Heatco
Infinitum (Fans)
ITM 4 Doors
Sanuvox
Starboard Controls
Tamco Dampers
VAW Silencers 
Wintec Doors
Modine/Heatcraft
Greenheck Fans
05 - SUPPLY CHAIN & PARTNERSHIPS

View this content as a flipbook by clicking here.